Case study · Portico Group · For leaders planning a move or big change
One command center moved a warehouse and office on time, with orders still shipping.
Orders kept shipping: from the new building while the old one was emptied
A live budget: every quote, bid and signed amount, with a low and high case, so the cash picture was always current
One RAID log: every risk, issue and decision logged with an owner and a date
- old building handed back
- On time
- old building handed back · on schedule
- smaller footprint
- ~40%
- smaller footprint · sized to what the business needs
- net cash from the lease agreements
- +$890K
- net cash from the lease agreements · more than the move cost
- sprinkler upgrade avoided
- ~$500K
- sprinkler upgrade avoided · by choosing the right building
A move is a hundred small projects that all have to land in the same week. The work is keeping them on one page.
- 1Plan
- 2Track
- 3Log
- 4Budget
- 5Decide
The challenge
The old building was about twice the size the business needed, with a lease that still had a year to run. A new, better building was available, with incentives that only existed if the company moved inside the landlord’s window. Staying was not free: waiting meant more rent on unused space, then a decision at market rates with none of the incentives. Orders had to keep going out, with only one short, planned pause, and leadership needed to know, every week, whether the move still made financial sense.
Our approach
We ran the move from one Smartsheet command center, so nobody finds out about a problem on moving day. We also built the board view of the move’s economics from the same budget tracker, and racking, network, and offices came online in sequence, tracked day by day.
The plan split the move into lanes, so each vendor’s work landed in one place
- Client
- National consumer wellness products company
- Scope
- Warehouse and office relocation, from lease to final inspection
- Platform
- Smartsheet · Dashboards · Reports · RAID log · Budget tracker
- Users
- CFO · Operations · Warehouse · IT · Vendors and contractors
- Status
- Complete
The numbers that matter came first, and each week’s decisions sat on one page
Each week, the CFO saw the two or three calls that needed an answer, with the cost of waiting spelled out, like the sample decisions here. Simplified illustration.
Sample decisions for the week
- Approve the construction contract once the price is confirmed
- Confirm temporary storage during build-out
- Drop exit repairs once the landlord confirms in writing
The same command center fits any project with too many vendors and a hard date
- Warehouse and plant relocations
- Office moves and new site openings
- Equipment installs
- Any operation that has to change underneath itself without stopping
One plan. One budget. One honest weekly view.
Related case studies
- ~$340KAnnual benefit projected from an East Coast fulfillment partner, with 1 to 2 days faster delivery. A clear go/no-go case for the board.Network strategy · National consumer wellness products company
- 12,000+Contingent workers onboarded and deployed with zero glitches, during what the union called the largest open-ended health care strike in U.S. history.Workforce mobilization · Large integrated health system
- 1Standard project kit, launched by Control Center, with every project rolling up to one portfolio view. In progress.Enterprise projects · Engineering firm